Thanks to Eric and his great work on the excavator, the driveway is almost in with a 3 car carport pad. All of the old concrete,landscaping,half dead trees, scrubs, and a lot of the blackberry bushes are gone. The elevation has been leveled, and we installed a French drain to protect the foundation. The French drain is huge wall of bed rock installed into a deep trench that wraps around the house with a perfer
ated pipe at the bottom to catch all the water before it gets to the foundation. Also we ran all new electric conduit from the house to the office/shop under ground.